This specification has been produced for implementation at new control centre schemes and may be considered for retrospective fitment at existing control centres that have a requirement for an automated route setting system. Purpose This document contains the system requirements for...
Purpose of paper To discuss an SSI version of the existing GEC Geographical interlocking controls for the Override Emergency Route Setting facility, specifically for use at Finsbury Park. This document is limited purely to the Override interlocking controls and is not to discuss other...
This specification covers the procurement requirements for concrete capping material, rapid setting. The concrete capping material, rapid setting may be used alone to cap crater repairs or after backfilling with MIL-DTL-32537 flowable fill backfill material, rapid setting as...
As board shops, contract assemblers, and original equipment manufacturers (OEMs) begin to understand the power of ion chromatography (IC) as a method to improve the quality and reliability of manufactured product, more will seek to bring this once-specialized science in house. However, there is a...
1. SCOPE The material defined by this specification is a non-setting sealing compound which is resistant to temperatures between -40 C and + 250 C within joint faces. The sealer will resist automotive fluids well in excess of normal operating temperatures and gives good clamping force...
This standard specifies the general requirements on setting out work for construction works and parts of such (e.g. industrial plants, traffic facilities) and for other objects. The objectives of this standard are to define agreements on setting out, to ensure the quality (see DIN EN...
This specification covers the procurement requirements for flowable fill backfill material, rapid setting. The flowable fill backfill material, rapid setting may be used alone to backfill crater repairs or to backfill crater repairs before they are capped with MIL-DTL-32536 concrete...
INTRODUCTION Generally ground frame controls require the ground frame release given before a route can be set either into or out of the sidings. Within the Swindon and Bristol schemes, however, there are various ground frames where the Interlocking Requirements Specification states that the...
Introduction The Maintenance Engineer (E&P) or representative shall be responsible for maintaining the up to date records of all previously calculated d.c. section "safe" settings and carrying out all future d.c. section "safe" setting calculations. The Maintenance Engineer (E&P) or...
Foreword A speciality is defined by specific knowledge and skills. Rehabilitation is, arguably, defined by three features. First, the process of rehabilitation is set within a holistic, biopsychosocial model of health and illness. Second, multidisciplinary teamwork is crucial, and single...
Narrow Your Results