loading
FORD FLTM BA 116-01 - BOLT PULL OUT PROCEDURES
October 16, 2014 - FORD

Application This test procedure is used to evaluate out-of-plane and in-plane bolt pull out force on test panels or flat sections of parts. Originally intended for aeroshields or underbody shields and wheel arch/well liners.

GMW14146 - Stitch Tear Out Resistance
June 1, 2017 - GMW

Introduction Note: Nothing in this standard supercedes applicable laws and regulations. Note: In the event of conflict between the English and domestic language, the English language shall take precedence. Purpose. The object of this test is to determine the resistance to which threads or fibers of...

GMKOREA EDS-T-2117 - Clutch Plate Run - Out
December 1, 2011 - GMKOREA

PURPOSE Determination of the clutch driven plate run-out.

MIL-STD-1339 - FITTING OUT PROCEDURES - SHIPS
February 27, 1990 - NPFC

The purpose of this military standard is to standardize contractor-related fitting out procedures and to definitize contractor fitting out responsibilities. This military standard prescribes shipbuilding contractor fitting out procedures for new construction, conversion and...

Drying out buildings
January 1, 1973 - BRE

Describes methods of drying out new buildings and of testing the condition of walls, floors and joinery. 4 pages.

NR TWI 3T040 - How to Set out Track
March 1, 2005 - NR

Introduction This Track Work Instruction gives general advice and some good practice on basic track setting out. See also the separate instruction: TWI 3T011 How to plan & carry out track surveying

ASME B89.3.1 - Measurement of Out-Of-Roundness
January 1, 1972 - ASME

General This standard covers the specification and measurement of out-of-roundness of a surface of revolution by the evaluation of a typical cross-sectional profile in terms of its radial deviations from a defined center. While this standard deals primarily with precision spindle instruments...

NR TWI 2P030 - How to Carry out Resleepering
March 1, 2005 - NR

Introduction This Track Work Instruction covers how to carry out resleepering over a length of track - not just an individual sleeper. This could be the case if you have to take out 10 consecutive inspection sleepers or have to replace track after a minor derailment. See also separate...

NR/GN/CIV/166 - R22 Refrigerant Systems - Phasing Out
December 4, 2010 - NR

This guidance is provided for phasing out of R22 refrigerant systems currently in use on all Network Rail Operational Property, in accordance with EU Regulations for reduction of greenhouse gases and gases which are likely to cause damage to the ozone layer. Guidance is provided for suitable...

TAPPI TIP 0305-47 - Multiple-out rotary diecut stacking
January 1, 2011 - TAPPI

By the very nature of running multiple "out" on a rotary diecutter, the blank size of each individual diecut will be small and quite often at or close to press and stacker minimums. As many of these same blanks can also be run two or more across (Or around), one can quickly see the potential...

NR/L3/TRK/002/B07 - Ballast - Dig Out Contaminant
August 1, 2007 - NR
A description is not available for this item.
NR/PRC/MPI/PP04 - Project Close Out
October 20, 2006 - NR

This procedure shall apply: When identifying project tasks as closed When setting the Liability Period flag When changing project ownership When archiving to a new database instance When archiving to a XER When updating methodologies Purpose This document describes the process and procedures that...

HN 2138 - TAPE - BLACK OUT
November 1, 2003 - HOLDEN
A description is not available for this item.
FORD WSS-M14J519-A - FADE OUT THINNER
April 29, 1998 - FORD

1. SCOPE The material defined by this specification is a low viscosity resin solution.

Cures out of Chaos
February 17, 1998 - CRC

This volume describes important medical discoveries, from the introduction of the first antibiotic to the present, where serendipity, intuition, coincidence, or laboratory accident played an important role in bringing a discovery to light. Although chance is the principal determinant, the book...

GME L-7B01B-16 - Clutch Plate Run-Out
April 1, 1996 - GME
A description is not available for this item.
JIS C 8301 - Cut-Out Switches
September 25, 1988 - JSA
A description is not available for this item.
GMI L-7B01B-16 - CLUTCH PLATE RUN-OUT
GME
A description is not available for this item.
GM9837P - TAPE WET-OUT TEST
GMNA
A description is not available for this item.
ASQ P369 - OUT OF THE CRISIS
ASQ
A description is not available for this item.
Advertisement