PREFACE This chapter is one of a series which make up the manual, Guide for Inspection of Refinery Equipment. It is based on the accumulated knowledge and experience of engineers of the petroleum industry. All users are invited to submit suggested revisions to the director of the Division of...
4.1 Significance: 4.1.1 Collection system maintenance requires allocating cleaning resources to the right place prior to system failure (sanitary sewer overflows, mainline blockages, and building backups). Transmissive acoustic inspection provides a tool to assist in allocating...
1.1 This guide is a compendium of information related to installing firestop systems in fire-separating elements. This guide is intended to be used to increase industry knowledge of national and international testing requirements, code prerequisites, and other supplemental tests that...
1.1 This specification covers the systems and equipment aspects of airworthiness and design for aircraft. The material was developed through open consensus of international experts in general aviation. This information was created by focusing on Level 1, 2, 3, and 4 Normal Category...
1.1 This Standard sets forth the minimum requirements for containment sumps, and associated sump fittings and accessories (products) intended for below-grade, or at-grade, or above-grade use as an enclosure for the housing of, and access to, underground piping, connector piping, and other fueling...
1.1 This Standard sets forth the minimum requirements for containment sumps, and associated sump fittings and accessories (products) intended for below-grade, or at-grade, or above-grade use as an enclosure for the housing of, and access to, underground piping, connector piping, and other fueling...
5.1 This practice applies to response actions for all types of asbestos-containing materials, including surfacing materials, thermal systems insulation, and miscellaneous materials, whether friable or not, regardless of the quantities involved and the reason for conducting the response...
1.1 This practice is a guide for removing test specimens from existing built-up roofing systems in the field and for determining the approximate quantities of the components of that specimen (Note 1). Components determined may be: 1.1.1 Insulation components when they are part of the roof...
5.1 Personnel that are responsible for the creation, transfer, and storage of computed radiography NDE data will use this practice. This practice will define a set of information modules that along with the Practice E2339 and the DICOM standard will provide a standard means to organize CR...
Narrow Your Results