UNLIMITED FREE ACCESS TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

IEC - 60534-4

Industrial-process control valves – Part 4: Inspection and routine testing

active, Most Current
Organization: IEC
Publication Date: 1 December 2021
Status: active
Page Count: 54
ICS Code (Valves): 23.060
scope:

This part of IEC 60534 specifies the requirements for the inspection and routine testing of control valves manufactured in conformity with the other parts of IEC 60534.

This document is applicable to valves with pressure ratings not exceeding Class 2500. The requirements for actuators apply only to pneumatic actuators.

This document does not apply to the types of control valves where radioactive service, fire safety testing, or other hazardous service conditions are encountered. If a standard for hazardous service conflicts with the requirements of this document, the standard for hazardous service should take precedence.

NOTE This document can be extended to higher pressure ratings by agreement between the purchaser and the manufacturer.

Document History

60534-4
December 1, 2021
Industrial-process control valves – Part 4: Inspection and routine testing
This part of IEC 60534 specifies the requirements for the inspection and routine testing of control valves manufactured in conformity with the other parts of IEC 60534. This document is applicable...
June 1, 2006
Industrial-Process Control Valves - Part 4: Inspection and Routine Testing
This part of IEC 60534 specifies the requirements for the inspection and routine testing of control valves manufactured in conformity with the other parts of IEC 60534. This standard is applicable to...
May 1, 1999
Industrial-Process Control Valves - Part 4: Inspection and Routine Testing
This part of IEC 60534 specifies the requirements for the inspection and routine testing of control valves manufactured in conformity with the other parts of IEC 60534. When specified, the inspection...
January 1, 1982
Industrial-Process Control Valves Part 4: Inspection and Routine Testing
A description is not available for this item.

References

Advertisement