loading
SSPC GUIDE 18 - Specifier's Guide for Determining Containment Class and Environmental Monitoring Strategies for Lead-Paint Removal Projects
February 1, 2008 - SSPC

This guide describes a six-step process to assist in determining the type of containment system and the level of environmental monitoring that should be specified on a projectspecific basis when removing coatings that contain lead. The selection of the containment and monitoring strategies...

ASTM E3193-21 - Standard Test Method for Measurement of Lead (Pb) in Dust by Wipe, Paint, and Soil by Flame Atomic Absorption Spectrophotometry (FAAS)
September 1, 2021 - ASTM International

1.1 This test method covers the determination of lead (Pb) in dust by wipe, paint, and soil collected in and around buildings and related structures by flame atomic absorption spectrophotometry (FAAS) and is derived from Test Methods D4185 and E1613. For determination of lead...

ASTM E1645-21 - Standard Practice for Preparation of Dried Paint Samples by Hotplate or Microwave Digestion for Subsequent Lead Analysis
September 1, 2021 - ASTM International

5.1 Paint in buildings and related structures needs to be monitored for lead content in order to determine the potential lead hazard. Hence, effective and efficient methods are required for the preparation of paint samples that may contain lead. 5.2 This practice...

NAVISTAR MPAPS GT-PAINT - Paint Test Methods
October 1, 2019 - NAVISTAR
A description is not available for this item.
ASTM E1729 - Standard Practice for Field Collection of Dried Paint Samples for Subsequent Lead Determination
September 1, 2020 - ASTM

This practice covers the collection of samples of dried paint and other coatings from buildings. This practice is used to collect samples for subsequent determination of lead on an area basis (milligrams of lead per area sampled) or concentration basis (milligrams of...

ASTM E1729-20 - Standard Practice for Field Collection of Dried Paint Samples for Subsequent Lead Determination
September 1, 2020 - ASTM International

5.1 Although this practice is intended for the collection of dried paint samples in and around buildings for the subsequent determination of lead content, this practice may also be used to collect paint samples from other structures for lead analysis.3 5.2 The...

ASTM E1796-03 - Standard Guide for Selection and Use of Liquid Coating Encapsulation Products for Leaded Paint in Buildings
October 1, 2003 - ASTM International

This standard primarily addresses encapsulant products for residential and child-care facilities. It may also be appropriate for some commercial buildings. Encapsulation provides a means of protecting occupants from exposure to lead in paint in buildings that are likely to remain...

ASTM E1797-04 - Standard Specification for Reinforced Liquid Coating Encapsulation Products for Leaded Paint in Buildings
April 1, 2004 - ASTM International

1.1 This specification covers minimum material performance requirements and laboratory test procedures for reinforced liquid coating encapsulation products (single- or multiple-coat systems) for leaded paint in buildings. Performance properties addressed in this specification are: 1.1...

ASTM E2252-22 - Standard Practice for Selection of Lead Hazard Reduction Methods for Identified Risks in Residential Housing or Child Occupied Facilities
March 1, 2022 - ASTM International

1.1 This practice describes the selection of lead hazard reduction methods for controlling lead hazard risks identified during risk assessments of residential dwellings and child occupied facilities. 1.2 The values stated in SI units are to be regarded as standard. The values given in...

ASTM E1797-03 - Standard Specification for Reinforced Liquid Coating Encapsulation Products for Leaded Paint in Buildings
October 1, 2003 - ASTM International

1.1 This specification covers minimum material performance requirements and laboratory test procedures for reinforced liquid coating encapsulation products (single- or multiple-coat systems) for leaded paint in buildings. Performance properties addressed in this specification are: 1.1...

ASTM E2255/E2255M-22 - Standard Practice for Conducting Visual Assessments for Lead Hazards in Buildings
March 1, 2022 - ASTM International

1.1 This practice describes procedures for conducting visual assessments in buildings to visually identify the type and location of potential lead hazards. These potential hazards are associated with deteriorated leaded paint, lead in dust, or lead in soil. 1.2...

ASTM D5702-18(2022) - Standard Practice for Field Sampling of Coating Films for Analysis for Heavy Metals
December 1, 2022 - ASTM International

3.1 Prior to beginning a project that involves the removal, cutting, grinding, or burning of paint, it is necessary to determine if the coating contains hazardous metals, such as lead. If it does, certain requirements for worker and environmental protection may need to be imposed. The...

ASTM E3203-19a - Standard Test Method for Determination of Lead in Dried Paint, Soil, and Wipe Samples by Inductively Coupled Plasma-Optical Emission Spectroscopy (ICP-OES)
November 1, 2019 - ASTM International

1.1 This test method specifies a procedure for analysis of dried paint, soil, and dust wipe samples collected in and around buildings and related structures for lead content using inductively coupled plasma-optical emission spectroscopy (ICP-OES). 1.2 This test method should be used...

ASTM E1795-04 - Standard Specification for Non-Reinforced Liquid Coating Encapsulation Products for Leaded Paint in Buildings
April 1, 2004 - ASTM International

1.1 This specification covers minimum material performance requirements and laboratory test procedures for non-reinforced liquid coating encapsulation products (single or multiple-coat systems) for leaded paint in buildings. Performance properties addressed in this specification are:...

UL 4402 - Indoor Air Quality in Buildings and Facilities Utilized for the Cultivation and Post-Harvest Processing of Cannabis
July 29, 2022 - ULSE

044020-000000-000000 1 Scope 1.1 This Standard provides minimum indoor air quality (IAQ) requirements and guidelines for a building or portions of a building utilized for cannabis cultivation, post-harvest processing as well as ancillary spaces. Note: For the purposes of this Standard, ancillary...

ULC 4402 - Qualité de l'air intérieur dans les bâtiments et les installations utilisés pour la culture et la transformation post-récolte du cannabis
July 29, 2022 - ULSE

044020-000000-000000 1 Scope 1.1 This Standard provides minimum indoor air quality (IAQ) requirements and guidelines for a building or portions of a building utilized for cannabis cultivation, post-harvest processing as well as ancillary spaces. Note: For the purposes of this Standard, ancillary...

ASTM E1645 - Standard Practice for Preparation of Dried Paint Samples by Hotplate or Microwave Digestion for Subsequent Lead Analysis
November 1, 2020 - ASTM

This practice covers the sample preparation procedures for paint samples that are collected during the assessment, management or control of lead hazards. This practice describes the digestion procedures using a hot plate or microwave oven or apparatus for paint samples that are...

ASTM E1645-20a - Standard Practice for Preparation of Dried Paint Samples by Hotplate or Microwave Digestion for Subsequent Lead Analysis
November 1, 2020 - ASTM International

5.1 Paint in buildings and related structures needs to be monitored for lead content in order to determine the potential lead hazard. Hence, effective and efficient methods are required for the preparation of paint samples that may contain lead. 5.2 This practice...

ASTM E1979-21 - Standard Practice for Ultrasonic Extraction of Paint, Dust, Soil, and Air Samples for Subsequent Determination of Lead
November 1, 2021 - ASTM International

1.1 This practice covers an ultrasonic extraction procedure for the extraction of lead from environmental samples of interest in lead abatement and renovation (or related) work, for analytical purposes. 1.2 Environmental matrices of concern include dry paint films, settled...

Advertisement