Part of the ISA/O3neida series, this book discusses network systems in industrial automation and their features related to real-time and functional safety requirements. The basics of standard Ethernet are introduced, specifying the Open System Interconnection (OSI) reference model layers and...
A fail-safe supply network is designed to mitigate the impact of variations and disruptions on people and corporations. This is achieved by (1) developing a network structure to mitigate the impact of disruptions that distort the network structure and (2) planning flow...
008270-000000-000000
This specification covers metal ceiling suspension systems used primarily to support acoustical tile or acoustical lay-in panels. Some suspension systems incorporate locking assembly details that enhance performance by providing some continuity or load transfer capability between adjacent sections...
This document applies to all staff undertaking work on behalf of Network Rail. It applies to all activities carried out to support the operational running of the infrastructure from the date of publication. NOTE 1: Our staff & their welfare is our number one priority and it is recognised...
This standard applies to any Infrastructure Maintenance staff from any discipline when carrying out routine or non-routine tasks identified within the index. Purpose This standard provides the index and version control of risk control sheets that mitigate risks associated with general activities,...
This standard lays down the requirements for: a) the design of signalling works applicable to the infrastructure; b) the design of signalling systems; c) the design of software and data used in programmable signalling systems; and d) the tools, including software, used in design. It applies from...
This standard applies to the asset management of all EP assets. Certain clauses also apply to the introduction of new EP assets to the rail network. Purpose The purpose of the Electrical Power (EP) asset policy within Network Rail is to provide reliable and safe operation of...
This document applies to all who are making changes to Network Rail managed level crossings fitted or to be fitted with POGO. Purpose This document specifies the application requirements for Power Operated gate Opener (POGO) to reduce the risk of conflict with trains and allow safe...
This standard applies: a) throughout the engineering access planning process and during the delivery of work; and b) to all Network Rail employees and contractors who plan and manage the movements of engineering trains / OTMs / OTP in worksites on Network Rail Managed Infrastructure....
1.1 The scope of this practice includes the following: 1.1.1 A set of components that comprise an RTA system. 1.1.2 Requirements and best practices to determine safe boundaries and RTA system coverage. 1.1.3 Requirements and best practices for an RTA system and RTA components, as applicable....