UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NR/L2/TRK/001/MOD05 ISSUE 9

Inspection and Maintenance of Permanent Way: Switches and Crossings

active, Most Current
Organization: NR
Publication Date: 3 June 2023
Status: active
Page Count: 34
scope:

This module of NR/L2/TRK/001 covers:

a) Inspection by patroller, Section Manager and Track Maintenance Engineer;

b) Inspection requirements and tolerances for

1) wear, 

2) flange back contact, 

3) free wheel clearance, 

4) false flange damage, 

5) gauge, 

6) switch position.

c) inspection and maintenance of S&C components including

1) bearers,

2) slide chairs,

3) baseplates,

4) fastenings,

5) lateral resistance plates.

d) track geometry through S&C;

e) replacement of switch sets and crossings;

f) securing (out of use) and plain lining;

g) hand operated points;

This module does not cover:

h) management of joints (see NR/L2/TRK/001/mod04);

i) visual inspection and ultrasonic testing of rails (see NR/L2/TRK/001/mod06).

Document History

NR/L2/TRK/001/MOD05 ISSUE 9
June 3, 2023
Inspection and Maintenance of Permanent Way: Switches and Crossings
This module of NR/L2/TRK/001 covers: a) Inspection by patroller, Section Manager and Track Maintenance Engineer; b) Inspection requirements and tolerances for 1) wear,  2) flange back contact, ...
December 5, 2020
Inspection and Maintenance of Permanent Way: Switches and Crossings
This module of NR/L2/TRK/001 covers: a) Inspection by patroller, Section Manager and Track Maintenance Engineer; b) Inspection requirements and tolerances for 1) wear, 2) flange back contact, 3)...
June 3, 2017
Inspection and Maintenance of Permanent Way: Switches and Crossings (S&C)
This module of NR/L2/TRK/001 covers: a) Inspection by patroller, Section Manager and TME; b) Inspection requirements and tolerances for 1) wear, 2) flange back contact, 3) free wheel clearance,...
December 1, 2012
Inspection & Maintenance of Permanent Way: Switches and Crossings (S&C)
Switches and crossings (S&C) are designed to steer trains safely from one track to another. S&C is more complex than plain line and requires detailed attention in order to manage the risk of...
Inspection & Maintenance of Permanent Way: Switches & Crossings (S&C)
Switches and crossings (S&C) are designed to steer trains safely from one track to another. S&C is more complex than plain line and requires detailed attention in order to manage the risk of...

References

Advertisement