NR/SP/ELP/27183
50 Cycle Single Phase AC Electrification Overhead Line Equipment
active, Most Current
Buy Now
| Organization: | NR |
| Publication Date: | 1 April 2006 |
| Status: | active |
| Page Count: | 12 |
scope:
This standard includes drawings, descriptions, loading diagrams, calculations and instructions appertaining to the equipment shall be provided in sufficient detail to permit efficient manufacture, erection and maintenance in "polluted" and "clean" areas,
Document History
NR/SP/ELP/27183
April 1, 2006
50 Cycle Single Phase AC Electrification Overhead Line Equipment
This standard includes drawings, descriptions, loading diagrams, calculations and instructions appertaining to the equipment shall be provided in sufficient detail to permit efficient manufacture,...
December 4, 2004
50 Cycle Single Phase A .C Electrification Overhead Line Equipment
A description is not available for this item.