UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

FAA-E-2553/4

TURNKEY FACILITY ESTABLISHMENT FOR RADAR MICROWAVE LINK (RML) SYSTEM PART 4 ELECTRONIC EQUIPMENT, INSTALLATION, TESTING AND DOCUMENTATION

active, Most Current
Organization: FAA
Publication Date: 8 August 1974
Status: active
Page Count: 14
scope:

This Part 4 is one of a group of specification documents under the basic heading Turnkey Facility Establishment for Radar Microwave Link (RML) Systems, each of which carries the basic number FAA-E-2553 together with slant line and number corresponding to the part number. Part 4 contains the requirements and criteria for the installation and tuneup of an RML system. This part supplements the General Requirements contained in Part 1 of this specification.

Document History

FAA-E-2553/4
August 8, 1974
TURNKEY FACILITY ESTABLISHMENT FOR RADAR MICROWAVE LINK (RML) SYSTEM PART 4 ELECTRONIC EQUIPMENT, INSTALLATION, TESTING AND DOCUMENTATION
This Part 4 is one of a group of specification documents under the basic heading Turnkey Facility Establishment for Radar Microwave Link (RML) Systems, each of which carries the basic number...

References

Advertisement