FAA-E-2553/3
TURNKEY FACILITY ESTABLISHMENT FOR RADAR MICROWAVE LINK SYSTEM PART 3 PLANT DESIGN AND CONSTRUCTION
| Organization: | FAA |
| Publication Date: | 8 August 1974 |
| Status: | active |
| Page Count: | 29 |
scope:
This Part 3 is one of a group of specification documents under the basic heading Turnkey Facility Establishment for Radar Microwave Link System, each of which carries the basic number FAA-E-2553 with a slant line and number corresponding to the part number. Part 3 contains requirements for all plant design and construction equipment, materials, and personnel services at the Radar Microwave Link Terminal and Repeater locations preparatory to the installation of the electronic equipment and ancillary items. It also includes construction of associated access roads to repeater locations. This Part supplements the General Requirements contained in Part 1 of this specification.
Document History