UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

FAA-E-2553/2

TURNKEY FACILITY ESTABLISHMENT FOR RADAR MICROWAVE LINK SYSTEM PART 2 PATH SELECTION AND DESIGN

active, Most Current
Organization: FAA
Publication Date: 8 August 1974
Status: active
Page Count: 15
scope:

This Part 2 is one of a group of specification documents under the basic heading Turnkey Facility Establishment for Radar Microwave Link System, each of which carries the basic number FAA-E-2553 with a slant line and number corresponding to the part number. Part 2 sets forth the technical requirements for the research, surveying, design, drawings, and documentation necessary for path selection of an RML system and RML site engineering.

Document History

FAA-E-2553/2
August 8, 1974
TURNKEY FACILITY ESTABLISHMENT FOR RADAR MICROWAVE LINK SYSTEM PART 2 PATH SELECTION AND DESIGN
This Part 2 is one of a group of specification documents under the basic heading Turnkey Facility Establishment for Radar Microwave Link System, each of which carries the basic number FAA-E-2553 with...

References

Advertisement