This document references:
S1157 - Track – Performance, Design and Configuration
Published by LUL
on
March 1, 2023
This standard applies to all London Underground (LU) track including running lines depot track and sidings. The standard covers: a) principles for new designs of track components and configurations...
This document references:
S1157 - Track – Performance, Design and Configuration
Published by LUL
on
March 1, 2023
This standard applies to all London Underground (LU) track including running lines depot track and sidings. The standard covers: a) principles for new designs of track components and configurations...
This document is referenced by:
S1168 - Track Asset Walkways
Published by LUL
on
August 1, 2020
This standard applies to the following: a) All track asset walkways. b) Locations where trains are stabled at Sidings and Depot Sidings (as defined by the TfL Management System Glossary). This...
This document is referenced by:
T0430 - Re-use of Track Materials
Published by LUL
on
February 1, 2021
This technical specification applies to existing track components. This technical specification is to be followed by managers and maintenance staff responsible for the upgrading and maintaining the...
This document is referenced by:
S1162 - Conductor rail – Performance, design and configuration
Published by LUL
on
September 1, 2021
This standard applies to the conductor rail system. It covers: a) the fundamental design criteria to be met in any new proposal involving the conductor rail system b) requirements to avoid the...