UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NR/L2/RMVP/0200/P501 ISSUE 3

Infrastructure Plant Manual: Systems of Work

inactive
Organization: NR
Publication Date: 3 June 2017
Status: inactive
Page Count: 21
scope:

This module defines the requirements for controlling risks when working with plant in particular situations, for example, on gradients and cants, in electrification areas or poor track conditions.

This module applies to all organisations involved with the planning or supply of plant, or carrying out/controlling plant operations on Network Rail-managed infrastructure and Network Rail projects.

See the index of NR/L2/RMVP/0200 for information on which:

a) specific roles this module applies to; and

b) modules that also apply to those roles.

Purpose

The implementation of this module contributes to mitigating the following risks:

a) compliance with legislation (LOLER, PUWER, HASAW);

b) runaway/failure to stop on demand, e.g. OTP running away on a gradient;

c) MEWPs becoming out of control, e.g. MEWP operator being crushed under a structure;

d) collision, e.g. collision between a RRV and an OTM;

e) overturning, e.g. RRV overturning during lifting operations;

f) damage to assets, e.g. RRV or its load hitting a passing train during ALO operation; and

g) derailment, e.g. trailer being loaded incorrectly; and staff injuries.

Document History

Infrastructure Plant Manual: Systems of Work
This module defines the requirements for controlling risks when working with plant in particular situations, for example, on gradients and cants, in electrification areas or poor track conditions....
December 1, 2018
Infrastructure Plant Manual: Systems of Work
This module defines the requirements for controlling risks when working with plant in particular situations, for example, on gradients and cants, in electrification areas or poor track conditions....
NR/L2/RMVP/0200/P501 ISSUE 3
June 3, 2017
Infrastructure Plant Manual: Systems of Work
This module defines the requirements for controlling risks when working with plant in particular situations, for example, on gradients and cants, in electrification areas or poor track conditions....
Infrastructure Plant Manual: Systems of Work
A description is not available for this item.
Infrastructure Plant Manual: Systems of Work
A description is not available for this item.

References

Advertisement