NR/L2/RMVP/0200/P503 ISSUE 3
Infrastructure Plant Manual: Planning for Lifting Operations
| Organization: | NR |
| Publication Date: | 3 June 2017 |
| Status: | inactive |
| Page Count: | 15 |
scope:
This module defines the requirements for a documented lift.
This module applies to all organisations involved with the planning or supply of plant, and those carrying out or controlling plant operations on Network Rail managed infrastructure and Network Rail projects.
See the index of NR/L2/RMVP/0200 for information on which:
a) specific roles this module applies to; and
b) modules that also apply to those roles.
Purpose
The implementation of this module contributes to mitigating the following risks:
a) compliance with legislation (LOLER, PUWER, HASAW);
b) damage to assets, e.g. RRV or its load hitting a passing train during ALO operation;
c) overturning, e.g. RRV overturning during lifting operations;
d) MEWPs becoming out of control, e.g. MEWP operator being crushed under a structure; and
e) collisions, e.g. collision between a RRV and an OTM; staff injuries, e.g. Operator.