UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NR/L2/RMVP/0200/P521 ISSUE 2

Infrastructure Plant Manual: On-Track Plant Operations Scheme

inactive
Organization: NR
Publication Date: 3 June 2017
Status: inactive
Page Count: 23
scope:

This module defines the on-track plant operations scheme (POS) for the provision and operation of OTP on Network Rail managed infrastructure (NRMI) and Network Rail projects.

This document applies to organisations carrying out OTP operations on NRMI and Network Rail projects. The following are pre-requisites for compliance with the POS:

a) safe use of plant for infrastructure work, as set out in this manual NR/L2/RMVP/0200;

b) product introduction and change, as set out in NR/L2/RSE/100/05;

c) engineering acceptance, as set out in RIS-1530-PLT; and

d) specific rules controlled through the Sentinel scheme.

Arrangements for the operation of on-track machines (OTM), portable and transportable plant, whether operating inside or outside of a possession, are outside the scope of this module

The Network Rail POS review panel act as the owners and administrators of the POS.

See the index of NR/L2/RMVP/0200 for information on which:

a) specific roles this module applies to; and

b) modules that also apply to those roles.

Purpose

The application of this module contributes to the control of the following risks:

a) risk of runaway, uncontrolled movement and collisions by on-track plant (OTP) with infrastructure, workforce or other vehicles;

b) risk of personal injury within a worksite: slips, trips and falls, struck by OTP; and

c) risk of implementing ineffective management control and supervision of OTP operations.

Document History

December 1, 2018
Infrastructure Plant Manual: On-Track Plant Operations Scheme
This module defines the on-track plant operations scheme (POS) for the provision and operation of OTP on Network Rail managed infrastructure (NRMI) and Network Rail projects. This document applies...
NR/L2/RMVP/0200/P521 ISSUE 2
June 3, 2017
Infrastructure Plant Manual: On-Track Plant Operations Scheme
This module defines the on-track plant operations scheme (POS) for the provision and operation of OTP on Network Rail managed infrastructure (NRMI) and Network Rail projects. This document applies...
December 5, 2015
Infrastructure Plant Manual: On-Track Plant Operations Scheme
This document defines the on-track plant operations scheme (POS) for the provision and operation of on-track plant (OTP) on Network Rail Managed Infrastructure (NRMI) and Network Rail Projects. This...

References

Advertisement