NR/L3/OPS/045/3.15 ISSUE 1
National Operating Procedure (NOP) 3.15: Defective On-Train Equipment
inactive
| Organization: | NR |
| Publication Date: | 2 September 2017 |
| Status: | inactive |
| Page Count: | 5 |
scope:
This process applies to Network Rail Route Controllers.
PURPOSE
This procedure manages the movement of trains with isolated or defective equipment.
Document History
September 7, 2019
National Operating Procedure (NOP) 3.15: Defective On-Train Equipment
This process applies to Network Rail Route Operation Controllers and sets out requirements and provides guidance to assist in the delivery of contingency plans and giving guidance to the safe...
NR/L3/OPS/045/3.15 ISSUE 1
September 2, 2017
National Operating Procedure (NOP) 3.15: Defective On-Train Equipment
This process applies to Network Rail Route Controllers.
PURPOSE
This procedure manages the movement of trains with isolated or defective equipment.