UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NEN 10512-10-4

Electromechanical components for electronic equipment - Basic testing procedures and measuring methods - Part 10: Impact tests (free components), static load tests (fixed components), endurance tests and overload tests - Section 4: Test 10d: Electrical overload (connectors)

inactive, Most Current
Organization: NEN
Publication Date: 1 January 1997
Status: inactive
Page Count: 18
ICS Code (Electromechanical components for electronic and telecommunications equipment): 31.220
scope:

Outlines electrical overload test of mated contact pairs of connectors with an electrical overload current flowing through them for a limited period of time, in the order of 1 ms to 1 s.

Document History

NEN 10512-10-4
January 1, 1997
Electromechanical components for electronic equipment - Basic testing procedures and measuring methods - Part 10: Impact tests (free components), static load tests (fixed components), endurance tests and overload tests - Section 4: Test 10d: Electrical overload (connectors)
Outlines electrical overload test of mated contact pairs of connectors with an electrical overload current flowing through them for a limited period of time, in the order of 1 ms to 1 s.

References

Advertisement