NR/L3/OPS/045/3.07

National Operating Procedure (NOP) 3.07: Signalling System Failures, Lineside Safety Equipment Failures, Track Defects and Receiving and Responding to RT3185 Forms

active, Most Current
Buy Now
Organization: NR
Publication Date: 2 June 2018
Status: active
Page Count: 13
scope:

This procedure applies to:

a) all Network Rail staff involved with failures of infrastructure equipment;

b) all reported failures or irregularities of the following equipment for which Network Rail is responsible occurring on Network Rail Controlled Infrastructure:

i) signal;

ii) Automatic Warning System (AWS);

iii) Train Protection Warning System (TPWS);

iv) European Rail Traffic Management System (ERTMS);

v) Automatic Train Protection;

vi) Transmission Voice-Machine (TVM).

PURPOSE

This procedure provides a risk based approach to manage incidents involving failures of:

a) signalling equipment;

NOTE: This includes both right side and wrong side failures (WSFs).

b) track defects; and

c) WSFs of lineside safety equipment involving:

i) Track Circuit Operating Device (TCOD);

ii) Lookout Operating Warning System (LOWS); and

iii) Automatic Track Warning System (ATWS).

It sets out the requirements to be agreed between Network Rail and Train Operating Companies (TOCs) and Freight Operating Companies (FOCs) in relation to the receipt and response to form RT3185 for faults for which Network Rail is responsible (as defined in RIS-8047-TOM).

 

Document History

NR/L3/OPS/045/3.07
June 2, 2018
National Operating Procedure (NOP) 3.07: Signalling System Failures, Lineside Safety Equipment Failures, Track Defects and Receiving and Responding to RT3185 Forms
This procedure applies to: a) all Network Rail staff involved with failures of infrastructure equipment; b) all reported failures or irregularities of the following equipment for which Network Rail...
September 2, 2017
National Operating Procedure (NOP) 3.07: Signalling System Failures, Lineside Safety Equipment Failures, Track Defects and Receiving and Responding to RT3185 Forms
This procedure applies to: a) all Network Rail staff involved with failures of infrastructure equipment; b) all reported failures or irregularities of the following equipment for which Network Rail...

References

Advertisement