NAVY - UFGS-01 32 17.00 20

COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS)

inactive
Buy Now
Organization: NAVY
Publication Date: 1 May 2018
Status: inactive
Page Count: 23
scope:

NOTE:

This guide specification applies to Design-Bid-Build and Design-Build projects and covers the preparation and use of Cost-Loaded Network Analysis Schedules (NAS) for construction using Primavera P6.

This specification Section applies primarily to MILCON projects and any other similar projects with multiple disciplines working simultaneously. These projects may have known critical completion dates and may involve multiple phases.

Confirm with the Administering FEAD/ROICC that the project schedule should be prepared under the requirements of this section. Further, this section must be reviewed and approved by the administering FEAD/ROICC prior to completion of the Request for Proposal (RFP).

Coordination is required with Section 01 20 00.00 20 PRICE AND PAYMENT PROCEDURES Section 01 20 00.05 20 PRICE AND PAYMENT PROCEDURES FOR DESIGN-BUILD with selection of "Earned Value Report" rather than "Schedule of Prices" in that section.

 

Document History

November 1, 2023
COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS)
A description is not available for this item.
May 1, 2018
COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS)
A description is not available for this item.
May 1, 2018
COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS)
NOTE: This guide specification applies to Design-Bid-Build and Design-Build projects and covers the preparation and use of Cost-Loaded Network Analysis Schedules (NAS) for construction using...
UFGS-01 32 17.00 20
May 1, 2018
COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS)
NOTE: This guide specification applies to Design-Bid-Build and Design-Build projects and covers the preparation and use of Cost-Loaded Network Analysis Schedules (NAS) for construction using...
February 1, 2015
COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS)
NOTE: This guide specification applies to Design-Bid-Build projects and covers the preparation and use of Cost-Loaded Network Analysis Schedules (NAS) for construction using Primavera P6.