UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NAVY - UFGS-01 32 17.00 20

COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS)

active, Most Current
Buy Now
Organization: NAVY
Publication Date: 1 May 2018
Status: active
Page Count: 24
scope:

NOTE:

This guide specification applies to Design-Bid-Build and Design-Build projects and covers the preparation and use of Cost-Loaded Network Analysis Schedules (NAS) for construction using Primavera P6.

Document History

November 1, 2023
COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS)
A description is not available for this item.
May 1, 2018
COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS)
A description is not available for this item.
UFGS-01 32 17.00 20
May 1, 2018
COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS)
NOTE: This guide specification applies to Design-Bid-Build and Design-Build projects and covers the preparation and use of Cost-Loaded Network Analysis Schedules (NAS) for construction using...
May 1, 2018
COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS)
NOTE: This guide specification applies to Design-Bid-Build and Design-Build projects and covers the preparation and use of Cost-Loaded Network Analysis Schedules (NAS) for construction using...
February 1, 2015
COST-LOADED NETWORK ANALYSIS SCHEDULES (NAS)
NOTE: This guide specification applies to Design-Bid-Build projects and covers the preparation and use of Cost-Loaded Network Analysis Schedules (NAS) for construction using Primavera P6.
Advertisement