UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

FAA - FO 8260.58A CHG 2

United States Standard For Performance Based Navigation (PBN) Instrument Procedure Design

inactive
Organization: FAA
Publication Date: 1 January 2018
Status: inactive
Page Count: 110
scope:

Purpose.

This change publishes procedure design criteria for required navigationperformance authorization required (RNP AR) departures. Also, changes were made based onPerformance Based Operations Aviation Rulemaking Committee (PARC) analysis of requestsreceived from industry. Furthermore, this change incorporates the updated Flight Standardsorganization structure while removing all Flight Standards routing symbols/codes (inaccordance with the Flight Standards Service Nomenclature).

Document History

September 15, 2022
United States Standard For Performance Based Navigation (PBN) Instrument Procedure Design
Purpose of This Order. This order provides guidance for the design and evaluation of Performance Based Navigation (PBN) Instrument Flight Procedures (IFPs). For the purposes of this order, PBN IFPs...
August 24, 2020
United States Standard For Performance Based Navigation (PBN) Instrument Procedure Design
Purpose of This Order. This order provides guidance for the design and evaluation ofPerformance Based Navigation (PBN) Instrument Flight Procedures (IFPs). For the purposes ofthis order, PBN IFPs...
September 11, 2018
United States Standard For Performance Based Navigation (PBN) Instrument Procedure Design
Purpose. This change publishes procedure design criteria for required navigation performance authorization required (RNP AR) departures. Also, changes were made based on PBN Aviation Rulemaking...
FO 8260.58A CHG 2
January 1, 2018
United States Standard For Performance Based Navigation (PBN) Instrument Procedure Design
Purpose. This change publishes procedure design criteria for required navigationperformance authorization required (RNP AR) departures. Also, changes were made based onPerformance Based Operations...
March 20, 2017
United States Standard For Performance Based Navigation (PBN) Instrument Procedure Design
Purpose. This change incorporates standardized methods for designing and evaluating Performance Based Navigation (PBN) instrument flight procedures (IFPs) in the United States and its territories.
March 14, 2016
United States Standard For Performance Based Navigation (PBN) Instrument Procedure Design
Purpose of this order. This order provides guidance for the design and evaluation of Performance Based Navigation (PBN) Instrument Flight Procedures (IFPs). For the purposes of this order, PBN IFPs...
March 14, 2016
United States Standard For Performance Based Navigation (PBN) Instrument Procedure Design
Purpose of this order. This order provides guidance for the design and evaluation of Performance Based Navigation (PBN) Instrument Flight Procedures (IFPs). For the purposes of this order, PBN IFPs...
September 21, 2012
United States Standard for Performance Based Navigation (PBN) Instrument Procedure Design
Purpose of This Order. This order provides a consolidated United States Performance Based Navigation (PBN) procedure design criteria.

References

Advertisement