UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NAVY - OPNAV 4400.9C

(N41) DEPOT LEVEL REPAIRABLE ITEM MANAGEMENT

inactive
Organization: NAVY
Publication Date: 27 October 2008
Status: inactive
Page Count: 5
scope:

This instruction applies to all activities that manage, use, process, repair, or control DLRs, (i.e., principal and secondary items with Material Control Codes E, G, H, Q, or x, with the exception of cognizance symbol 6RX).

Purpose. To provide policy and assign responsibilities for the management of Depot Level Repairables (DLRs). This instruction has been administratively revised.

Document History

September 18, 2017
(N41) DEPOT LEVEL REPAIRABLE ITEM MANAGEMENT
This instruction applies to all activities that manage, use, process, repair, or control DLRs (i.e., principal and secondary items with material control codes E, G, H, Q, or X, with the exception of...
OPNAV 4400.9C
October 27, 2008
(N41) DEPOT LEVEL REPAIRABLE ITEM MANAGEMENT
This instruction applies to all activities that manage, use, process, repair, or control DLRs, (i.e., principal and secondary items with Material Control Codes E, G, H, Q, or x, with the exception of...
July 12, 1989
(OP-412E) DEPOT LEVEL REPAIRABLE ITEM MANAGEMENT
This instruction applies to all activities that manage, use, process, repair, or control DLRs, (i.e., principal and secondary items with Material Control Codes (MCCs) E, G, H, Q, or X, with the...

References

Advertisement