NAVY - OPNAV 4400.9B
(OP-412E) DEPOT LEVEL REPAIRABLE ITEM MANAGEMENT
inactive
| Organization: | NAVY |
| Publication Date: | 12 July 1989 |
| Status: | inactive |
| Page Count: | 5 |
scope:
This instruction applies to all activities that manage, use, process, repair, or control DLRs, (i.e., principal and secondary items with Material Control Codes (MCCs) E, G, H, Q, or X, with the exception of COG 6RX).
Document History
September 18, 2017
(N41) DEPOT LEVEL REPAIRABLE ITEM MANAGEMENT
This instruction applies to all activities that manage, use, process, repair, or control DLRs (i.e., principal and secondary items with material control codes E, G, H, Q, or X, with the exception of...
October 27, 2008
(N41) DEPOT LEVEL REPAIRABLE ITEM MANAGEMENT
This instruction applies to all activities that manage, use, process, repair, or control DLRs, (i.e., principal and secondary items with Material Control Codes E, G, H, Q, or x, with the exception of...
OPNAV 4400.9B
July 12, 1989
(OP-412E) DEPOT LEVEL REPAIRABLE ITEM MANAGEMENT
This instruction applies to all activities that manage, use, process, repair, or control DLRs, (i.e., principal and secondary items with Material Control Codes (MCCs) E, G, H, Q, or X, with the...