This document references:
S1026 - Topographical surveys and mapping
Published by LUL
on
May 1, 2018
This standard applies to London Underground (LU) and suppliers and defines: a) the requirements for topographical surveys and mapping performed by London Underground (LU) and its Suppliers surveying...
This document references:
S1023 - Infrastructure Protection
Published by LUL
on
January 1, 2017
Purpose The purpose of this standard is to define how LU deal with Outside Parties to avoid disruption to LU operations or damage to LU assets when undertaking or proposing to undertake works on,...
This document references:
S1622 - Glossary of Terms and Abbreviations
Published by LUL
on
July 1, 2016
This Standard applies to all Category 1, 2 and 5 Standards and the Railway Safety Case (and successor documents). It applies to technical and financial documents where applicable and communications...
This document is referenced by:
S1158 - Track – Inspection and Maintenance
Published by LUL
on
August 1, 2023
This standard applies to the Permanent Way system in running lines, depots and sidings. It covers, but is not limited to, the following components of track: a) running rails b) check rails c) rail...
This document is referenced by:
S1041 - Engineering Asset Information
Published by LUL
on
July 1, 2015
This standard applies to assets which are: a) LU owned and for which it is directly responsible b) LU owned but which are leased to others or managed and/or maintained by an Entity c) Owned by an...
This document is referenced by:
S1004 - Signage for Operational Purposes
Published by LUL
on
October 1, 2021
This standard covers LU signage intended for operational use including track, depot, equipment, safety, and statutory signage. This Standard applies to providers, installers, and maintainers of...
This document is referenced by:
S1227 - Train System Performance Evaluation
Published by LUL
on
September 1, 2013
This standard applies to all railway projects that change the data sets described in sections 3 to 9 below. It should be noted that a change to the data sets does not automatically require Train...