NR/L3/ELP/27115
Arrangements for Isolation of the Conductor Rail for Pre-Planned Possessions of the Line
| Organization: | NR |
| Publication Date: | 1 September 2018 |
| Status: | active |
| Page Count: | 19 |
scope:
These instructions apply to the 750V DC Conductor rail electrified areas of the Network Rail system except for:-
- Liverpool Area DC network (Merseyrail)
- Watford DC Lines (Euston
- Watford Junction) - Northern City Line
Purpose
These instructions specify the actions and documentation required for staff undertaking isolations in connection with possessions. These instructions are additional to the requirements of the DC Electrified Lines Instructions, NR/L3/ELP/3091
Document History