NR/WI/ELP/27115 ISSUE 2
Arrangements for isolation of the conductor rail for pre-planned possessions of the line
inactive
| Organization: | NR |
| Publication Date: | 1 February 2006 |
| Status: | inactive |
| Page Count: | 10 |
scope:
These instructions apply to Network Rail South East Territory only.
Purpose
These instructions are additional to the requirements of the DC Electrified Lines Instructions, GO/RT/3091. They specify the actions and documentation required for Isolations in connection with TIII possessions.
Document History
September 1, 2018
Arrangements for Isolation of the Conductor Rail for Pre-Planned Possessions of the Line
These instructions apply to the 750V DC Conductor rail electrified areas of the Network Rail system except for:-
- Liverpool Area DC network (Merseyrail)
- Watford DC Lines (Euston
– Watford...
August 26, 2008
Arrangements for Isolation of the Conductor Rail for Pre-Planned Possessions of the Line
These instructions apply to Network Rail South East area only.
Purpose
These instructions are additional to the requirements of the DC Electrified Lines Instructions, NR/WI/ELP/3091. They specify...
NR/WI/ELP/27115 ISSUE 2
February 1, 2006
Arrangements for isolation of the conductor rail for pre-planned possessions of the line
These instructions apply to Network Rail South East Territory only.
Purpose
These instructions are additional to the requirements of the DC Electrified Lines Instructions, GO/RT/3091. They specify...
December 4, 2004
Arrangements for Isolation of the Conductor Rail for Pre-Planned Possessions of the Line (aka NR/WI/ELP/27115)
These instructions apply to Railtrack South and South West Zones.
Purpose
These instructions are additional to the requirements of the new DC Electrified Lines Instructions (ELI), GO/RT/3091. They...