LUL - G1061

First Article Inspections

inactive
Organization: LUL
Publication Date: 1 February 2019
Status: inactive
Page Count: 12
scope:

This guidance applies to all Track engineers inspecting the quality of track products being supplied to LU. Guidance should be followed in these circumstances:

a) Introducing a new product to LU

b) A currently approved product is being manufactured/supplied by a new provider

c) Any current product that is manufactured to either a mould or pattern where the mould or pattern has been refurbished/repaired

d) Any authorised changes to a currently approved product, e.g. material change

e) In response to problems arising during the use of any product to LU. Findings from the FAI should be captured in a report.

Purpose

To provide guidance for carrying out First Article Inspections (FAI) on new or modified track products to be used on the London Underground (LU) network, to ensure the product meets the requirements

Document History

October 1, 2023
Track - First Article Inspections
This guidance applies to all Track engineers inspecting the quality of track products being supplied to LU. Guidance should be followed in these circumstances: a) Introducing a new product to LU b)...
G1061
February 1, 2019
First Article Inspections
This guidance applies to all Track engineers inspecting the quality of track products being supplied to LU. Guidance should be followed in these circumstances: a) Introducing a new product to LU b)...