NR/L2/TRK/053/MOD03
Inspection and Repair to Control the Risk of Derailment at Switches: Module 3: Repair of Switches
active, Most Current
Buy Now
| Organization: | NR |
| Publication Date: | 7 September 2019 |
| Status: | active |
| Page Count: | 11 |
scope:
This module of NR/L2/TRK/053 covers:
a) the process for determining the repair of switch and stock rails where a detailed inspection has identified that immediate or remedial action is required;
b) welding and grinding requirements in relation to remedial action;
c) checks carried out both during and on completion of the remedial works; and
d) lubrication following repair.
Document History
December 3, 2022
Inspection and Repair to Control the Risk of Derailment at Switches: Module 3: Repair of Switches
This module of NR/L2/TRK/053 covers:
a) the process for determining the repair of switch and stock rails where a detailed inspection has identified that immediate or remedial action is required; ...
NR/L2/TRK/053/MOD03
September 7, 2019
Inspection and Repair to Control the Risk of Derailment at Switches: Module 3: Repair of Switches
This module of NR/L2/TRK/053 covers:
a) the process for determining the repair of switch and stock rails where a detailed inspection has identified that immediate or remedial action is required;
b)...
June 3, 2017
Inspection and Repair to Control the Risk of Derailment at Switches: Module 3: Detailed Inspection of Switches
This module of NR/L2/TRK/053 covers:
a) How to complete a detailed inspection of switches
b) Actions to be taken as a result of defects identified during inspection
December 3, 2016
Inspection and Repair to Control the Risk of Derailment at Switches: Module 3: Detailed Inspection of Switches
This module of NR/L2/TRK/053 covers:
a) How to complete a detailed inspection of switches
b) Actions to be taken as a result of defects identified during inspection