UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

TIA-102.BCAE

Project 25 Phase 2 Two-Slot Time Division Multiple Access Trunked Voice Services Message and Procedures Conformance Specification

active, Most Current
Buy Now
Organization: TIA
Publication Date: 1 July 2011
Status: active
Page Count: 104
scope:

This document is intended to test aspects of the operation of a subscriber and a Radio Frequency Sub-System (RFSS) in the interests of adhering to key aspects of the Two-Slot Trunked TDMA Voice Services Common Air Interface MAC protocol as described in [R1]. It includes a set of CP items or procedures for basic operation. A CP is a conformance test consisting of set of pre-conditions and input parameters that result in an expected output from a Unit Under Test. The CP nomenclature provides an independent conformance test numbering system that is unique with this Standard and not dependent on the paragraph, clause, or subclause numbering used in the document.The CPs are:

• CP 1 - Voice Channel Procedures

• CP 1.1 - Assigned VCH Initial Access Procedures

• CP 1.2 - Assigned VCH Maintenance Procedures

• CP 1.3 - Assigned VCH Termination Procedures

• CP 1.4 - Assigned VCH Message Trunking Call Continuation Procedures

• CP 1.5 - Assigned VCH Pre-emption Procedures

This document is intended for use by manufacturers to serve as a standard reference for verifying adherence to the MAC protocol as described in [R1], as a means of assisting manufacturers in the development of interoperable TIA102 series equipment, and as a means of assisting manufacturers in the diagnosis of interoperability issues, should they occur. This document is not designed for use as a functional test suite. This document assumes an audience familiar with terms and definitions contained in the TIA102 series standards.

Document History

TIA-102.BCAE
July 1, 2011
Project 25 Phase 2 Two-Slot Time Division Multiple Access Trunked Voice Services Message and Procedures Conformance Specification
This document is intended to test aspects of the operation of a subscriber and a Radio Frequency Sub-System (RFSS) in the interests of adhering to key aspects of the Two-Slot Trunked TDMA Voice...

References

Advertisement