NR/L2/SIG/50019 ISSUE 3

Procedure to Control the Issue S&T Keys from Unipart Rail

inactive
Organization: NR
Publication Date: 4 September 2010
Status: inactive
Page Count: 7
scope:

The keys covered by this process include all those used to access signalling and telecommunications operational equipment.

Purpose

There is a need to control the issue of keys allowing access to operational signalling and telecoms equipment so that only those competent to work in the vicinity of such equipment can access it. This is so that risk to the operational railway is minimised. This procedure explains the process that has been agreed between Network Rail and Unipart Rail to control the issue of S&T keys by Unipart Rail.

The principle behind issue of keys to any party is that they are either a Network Rail employee requiring access to operational equipment as part of their duties or they are a contractor working on behalf of Network Rail with similar needs. In both instances, keys shall only be issued to employees for the duration of time that they have duties requiring such access. Thus Network Rail contract and project managers shall arrange that keys are returned to Network Rail by a contractor at the end of a contract. Network Rail line managers shall arrange that keys are withdrawn from any individual leaving the company or transferring to a role within the company which no longer requires operational access.

Document History

March 4, 2023
Control of the Issue of S&T Keys from Network Rail
This business process controls the issue of S&T keys that allow access to operational signalling and telecoms equipment. It includes all keys used to access signalling and telecommunications...
March 3, 2012
Control of the Issue of S&T Keys from Unipart Rail
This process is issued by the Professional Head (S&T) as the function with asset responsibility for operational signals and telecoms equipment. As the majority of keys are required by Maintenance,...
NR/L2/SIG/50019 ISSUE 3
September 4, 2010
Procedure to Control the Issue S&T Keys from Unipart Rail
The keys covered by this process include all those used to access signalling and telecommunications operational equipment. Purpose There is a need to control the issue of keys allowing access to...
August 26, 2008
Network Rail Procedure to Control the Issue of S&T Safety Locks and Keys from Unipart Rail
The locks and keys covered by this process include all those used to access signalling and telecommunications operational equipment. This includes any special order lock types configured to accept...
March 1, 2007
Procedure To Control The Issue Of S&T Safety Locks And Keys From Unipart Rail
The locks and keys covered by this process include all those used to access signalling and telecommunications operational equipment. This includes any special order lock types configured to accept...