UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NR/L2/SIG/50019 ISSUE 5

Control of the Issue of S&T Keys from Network Rail

active, Most Current
Organization: NR
Publication Date: 4 March 2023
Status: active
Page Count: 11
scope:

This business process controls the issue of S&T keys that allow access to operational signalling and telecoms equipment.

It includes all keys used to access signalling and telecommunications operational equipment. The keys included can be found in Appendix A

Purpose 

This business process sets out how Network Rail confirms that only competent people can access sites that contain operational signalling and telecoms equipment. This minimises risk to individuals and the operational railway.

Document History

NR/L2/SIG/50019 ISSUE 5
March 4, 2023
Control of the Issue of S&T Keys from Network Rail
This business process controls the issue of S&T keys that allow access to operational signalling and telecoms equipment. It includes all keys used to access signalling and telecommunications...
March 3, 2012
Control of the Issue of S&T Keys from Unipart Rail
This process is issued by the Professional Head (S&T) as the function with asset responsibility for operational signals and telecoms equipment. As the majority of keys are required by Maintenance,...
September 4, 2010
Procedure to Control the Issue S&T Keys from Unipart Rail
The keys covered by this process include all those used to access signalling and telecommunications operational equipment. Purpose There is a need to control the issue of keys allowing access to...
August 26, 2008
Network Rail Procedure to Control the Issue of S&T Safety Locks and Keys from Unipart Rail
The locks and keys covered by this process include all those used to access signalling and telecommunications operational equipment. This includes any special order lock types configured to accept...
March 1, 2007
Procedure To Control The Issue Of S&T Safety Locks And Keys From Unipart Rail
The locks and keys covered by this process include all those used to access signalling and telecommunications operational equipment. This includes any special order lock types configured to accept...
Advertisement