UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NR/L3/SIG/19808

Hy-Drive Supplementary Point Drive System

active, Most Current
Buy Now
Organization: NR
Publication Date: 7 March 2020
Status: active
Page Count: 36
scope:

This work instruction specifies:

1) how to install and set up the Hy-Drive Supplementary Point Drive System when used on Network Rail controlled infrastructure;

NOTE: This system is used in conjunction with an In-bearer Clamp lock to create the Hy-Drive Points System. This applies to systems that are used to operate switch lengths C to H switch on NR60/NR60

Mark 2 S & C and switch lengths F to G on NR56v S&C.

2) key differences between the Hy-Drive Mk1 and Mk2 designs (for NR60); and

3) differences introduced with the introduction of NR56v Hy-Drive.

This work instruction covers the Hy-Drive systems used in NR60 Mark 1, NR60 Mark 2 and NR56vS & C (shown in Table 1).

It applies to staff assessed as competent to install and maintain Hy-Drive Supplementary Point Drive systems.

Purpose

This work instruction supports the installation and maintenance of the Hy-Drive Supplementary Point Drive System. It is intended to control the risk of incorrect

componentry and set-up being applied in Hy-Drive systems. It is a reference document to support staff working with the system

Document History

Hy-Drive Supplementary Point Drive System
This work instruction specifies: 1) how to install and set up the Hy-Drive Supplementary Point Drive System when used on Network Rail controlled infrastructure;  NOTE: This system is used in...
NR/L3/SIG/19808
March 7, 2020
Hy-Drive Supplementary Point Drive System
This work instruction specifies: 1) how to install and set up the Hy-Drive Supplementary Point Drive System when used on Network Rail controlled infrastructure; NOTE: This system is used in...
August 18, 2014
Hy-Drive Supplementary Point Drive System
This Network Rail standard specifies requirements and guidance on the Hy-drive Supplementary Point Drive System which is used in conjunction with an In-bearer Clamp lock to create the Hy-drive Points...
September 3, 2011
Alstom So Hydraulic Supplementary Point Drive System - Installation & Set-Up
The contents of this standard are of relevance to all who are engaged in, or manage, Signalling Installation and Maintenance works on Network Rail controlled Infrastructure that includes Alstom SO...
February 12, 2007
Alstom So Hydraulic Supplementary Point Drive System - Installation & Set-Up
The contents of this document are of relevance to all who are engaged in, or manage, Signalling Installation and Maintenance works on Network Rail controlled Infrastructure that includes Alstom SO...

References

Advertisement