UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NR/L3/SIG/19808 ISSUE 3

Hy-Drive Supplementary Point Drive System

inactive
Organization: NR
Publication Date: 18 August 2014
Status: inactive
Page Count: 28
scope:

This Network Rail standard specifies requirements and guidance on the Hy-drive Supplementary Point Drive System which is used in conjunction with an In-bearer Clamp lock to create the Hy-drive Points System. This applies to systems that are used to operate NR60 Rail from C switch to H switch length.

This standard specifies installation information and set-up advice as well as key differences between the MkI and MkII designs. This standard applies to staff that are deemed competent to install and maintain the Hy-Drive Points system.

Purpose

The contents of this standard provide information on how to install and set-up Hy- Drive Supplementary Point Drive System when used on Network Rail controlled Infrastructure.

This standard will produce the relevant guidance and mandatory information to supports the installation and maintenance of the Hy-Drive Supplementary Point Drive System. Information published within NR/SIN/118 to mitigate the risk of flange contact with the Break-Out Device is contained within this document.

The Hy-drive Supplementary Point Drive System now has two designs known as MkI and MkII. This Work Instruction explains the key changes that were introduced in 2014 as part of the MkII design.

Document History

Hy-Drive Supplementary Point Drive System
This work instruction specifies: 1) how to install and set up the Hy-Drive Supplementary Point Drive System when used on Network Rail controlled infrastructure;  NOTE: This system is used in...
March 7, 2020
Hy-Drive Supplementary Point Drive System
This work instruction specifies: 1) how to install and set up the Hy-Drive Supplementary Point Drive System when used on Network Rail controlled infrastructure; NOTE: This system is used in...
NR/L3/SIG/19808 ISSUE 3
August 18, 2014
Hy-Drive Supplementary Point Drive System
This Network Rail standard specifies requirements and guidance on the Hy-drive Supplementary Point Drive System which is used in conjunction with an In-bearer Clamp lock to create the Hy-drive Points...
September 3, 2011
Alstom So Hydraulic Supplementary Point Drive System - Installation & Set-Up
The contents of this standard are of relevance to all who are engaged in, or manage, Signalling Installation and Maintenance works on Network Rail controlled Infrastructure that includes Alstom SO...
February 12, 2007
Alstom So Hydraulic Supplementary Point Drive System - Installation & Set-Up
The contents of this document are of relevance to all who are engaged in, or manage, Signalling Installation and Maintenance works on Network Rail controlled Infrastructure that includes Alstom SO...

References

Advertisement