This document references:
BB218 - Fire Precautions Exemption Applications
Published by LUL
on
December 18, 2014
Purpose This document explains when it is necessary to obtain a temporary exemption from The Fire Precautions (Sub-surface Railway Stations) Regulations 1989 (the ‘sub-surface regulations') and how...
This document is referenced by:
S1062 - Temporary Works
Published by LUL
on
December 1, 2022
This standard applies to all parties carrying out TW design, implementation, management and removal of temporary works to comply with BS5975. For third party (outside party) TW being undertaken...
This document is referenced by:
G3175 - Permit to Work Guidance - Fleet
Published by LUL
on
January 1, 2015
What is the Permit to Work process? The Permit to Work process is a formally documented system for: Controlling access to locations where potentially hazardous work needs to be undertaken. Ensuring...
This document is referenced by:
T0433 - Conductor Rail Arc Welding
Published by LUL
on
April 1, 2022
This specification applies to steel conductor rails and steel conductor rail ramps using the arc-welding process on site. It does not apply to composite conductor rail. This specification applies to...