UFC 3-540-01
ENGINE-DRIVEN GENERATOR SYSTEMS FOR PRIME \1\ AND STANDBY POWER APPLICATIONS /1/
| Organization: | UFC |
| Publication Date: | 1 August 2014 |
| Status: | active |
| Page Count: | 84 |
scope:
PURPOSE AND SCOPE.
This Unified Facilities Criteria (UFC) has been issued to provide criteria for the design of engine driven generator systems for standby and prime power applications.
The information provided here must be utilized by engineers in the development of the plans, specifications, calculations, and Design / Build Request for Proposals (RFP) and serves as the minimum design requirements. It is applicable to the traditional services customary for Design-Bid-Build construction contracts and for Design-Build construction contracts. Project conditions may dictate the need for a design that exceeds these minimum requirements.
Document History