UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NEN-EN 1253-8

Gullies for buildings - Part 8: Trapped floor gullies with combined mechanical closure and water seal

inactive
Organization: NEN
Publication Date: 1 July 2020
Status: inactive
Page Count: 34
ICS Code (Drainage systems): 91.140.80
scope:

This document classifies floor gullies for use inside buildings, gives guidance for places of installation and specifies requirements for the construction, design, performance and marking of factory made gullies for buildings, irrespective of the material, for use in drainage systems requiring a trap with combined mechanical closure and water seal (referred to as floor gullies)

NOTE Floor gullies with combined mechanical closure and water seal are not covered by Part 1, Part 6, Part 7.

These products are intended to be installed where:

- the building does not exceed a ground-floor and three floors above

Document History

November 1, 2022
Gullies for buildings - Part 8: Trapped floor gullies with combined mechanical closure and water seal
This document classifies floor gullies for domestic wastewater for use inside buildings, gives guidance, gives guidance for places of installation and specifies requirements for the construction,...
NEN-EN 1253-8
July 1, 2020
Gullies for buildings - Part 8: Trapped floor gullies with combined mechanical closure and water seal
This document classifies floor gullies for use inside buildings, gives guidance for places of installation and specifies requirements for the construction, design, performance and marking of factory...

References

Advertisement