UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NR - RT/D/P/095 ISSUE 1

Determining High Risk Sites for Wrong Side Track Circuit Failures in Leaf Fall Areas (aka NR/SP/OPS/095)

inactive
Organization: NR
Publication Date: 1 August 2004
Status: inactive
Page Count: 10
scope:

This procedure describes the assessment process for identifying high risk sites for wrong side track circuit failures in leaf fall areas, and this shall be used by Route Directors to enable the appropriate action to be taken in accordance with Group Standard GO/RT3208.

Purpose

The purpose of this procedure is to ensure that all sites which may be 'high risk' in respect of being likely to cause wrong side track circuit failures (WSTCF) under leaf fall contamination conditions are defined in a consistent way across all Network Rail controlled infrastructure, and that a structured process exists to alter the status of sites.

Document History

June 1, 2019
High Risk Sites for Wrong Side Track Circuit Failures in Leaf Fall Areas and for Low Rail Adhesion
This business process sets out the assessment processes for identifying high risk sites in respect of wrong side track circuit failures under leaf fall contamination conditions. It is to be used by...
September 5, 2015
High Risk Sites for Wrong Side Track Circuit Failures in Leaf Fall Areas and for Low Rail Adhesion
This standard describes the assessment processes for identifying high risk sites in respect of wrong side track circuit failures under leaf fall contamination conditions, and shall be used by Route...
June 6, 2015
High Risk Sites for Wrong Side Track Circuit Failures in Leaf Fall Areas and for Low Rail Adhesion
This standard describes the assessment processes for identifying high risk sites in respect of wrong side track circuit failures under leaf fall contamination conditions, and shall be used by Route...
March 5, 2011
Determining High Risk Sites for Wrong Side Track Circuit Failures in Leaf Fall Areas (aka NR/SP/OPS/095)
This standard describes the assessment processes for identifying ‘high risk' sites in respect of wrong side track circuit failures under leaf fall contamination conditions, and shall be used by Route...
September 5, 2009
Determining High Risk Sites for Wrong Side Track Circuit Failures in Leaf Fall Areas (aka NR/SP/OPS/095)
This standard describes the assessment processes for identifying ‘high risk' sites in respect of wrong side track circuit failures under leaf fall contamination conditions, and shall be used by Route...
RT/D/P/095 ISSUE 1
August 1, 2004
Determining High Risk Sites for Wrong Side Track Circuit Failures in Leaf Fall Areas (aka NR/SP/OPS/095)
This procedure describes the assessment process for identifying high risk sites for wrong side track circuit failures in leaf fall areas, and this shall be used by Route Directors to enable the...
Advertisement