UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

UFC 3-450-01

NOISE AND VIBRATION CONTROL

active, Most Current
Organization: UFC
Publication Date: 8 December 2022
Status: active
Page Count: 251
scope:

This UFC applies to all new construction and to major alteration of existing structures. US government facilities that require higher standards because of special functions or missions are not covered in this document; criteria for these and other exceptions are normally contained in a design directive. If standards given in this UFC and its referenced documents do not provide all the needs of a project, recognized construction practices and design standards must be used.

PURPOSE.

This UFC provides qualified designers the criteria required for design and construction of those features related to noise and vibration control of electro-mechanical, mechanical, ductwork, and plumbing systems most commonly encountered in government facilities.

Document History

UFC 3-450-01
December 8, 2022
NOISE AND VIBRATION CONTROL
This UFC applies to all new construction and to major alteration of existing structures. US government facilities that require higher standards because of special functions or missions are not...
May 15, 2003
NOISE AND VIBRATION CONTROL
These criteria apply to all new construction and to major alteration of existing structures. US military facilities that require higher standards because of special functions or missions are not...

References

Advertisement