UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NR - RT/E/P/14201 ISSUE 1

Prevention and Mitigation of Overruns - Risk Assessment of Signals (aka NR/SP/SIG/14201)

inactive
Organization: NR
Publication Date: 1 April 2003
Status: inactive
Page Count: 25
scope:

This procedure applies to anyone given the responsibility by Network Rail for conducting overrun risk assessments of railway signals forming part of track layouts and fixed block signalling systems on Network Rail Controlled Infrastructure. They may be either Network Rail employees or appointed contractors/consultants acting on behalf of Network Rail. The appointment shall be made in writing and held on file

It will be used for the assessment of safety risk: -

• uring the design of new/altered layouts and fixed block signalling systems on Network Rail Controlled Infrastructure.

• rising as a result of the operation of layouts and signalling.

Purpose

This document sets out the process and tools that Network Rail shall use to comply with the Railway Group Standard GI/RT7006, Prevention and Mitigation of Overruns  - Risk Assessment, and its associated Guidance Note GI/GN7606. Specifically this Procedure mandates: -

• he structured approach to signal overrun, i.e. "Signal Passed at Danger" (SPAD) risk assessment on Network Rail Controlled Infrastructure.

• The appropriate strategies, tools, and techniques to be applied under the variety of operational and developmental situations that lead to a requirement for a signal overrun risk assessment to be undertaken.

• A clear approach to SPAD risk assessment, which shall be standardised throughout Network Rail.

Document History

December 5, 2020
Signalling Risk Assessment Handbook
This handbook is applicable to those undertaking signalling safety risk assessment where Network Rail is the Infrastructure Manager. They could be either Network Rail employees or appointed...
March 2, 2019
Signalling Risk Assessment Handbook
This handbook is applicable to those undertaking signalling safety risk assessment where Network Rail is the Infrastructure Manager. They could be either Network Rail employees or appointed...
September 1, 2018
Signalling Risk Assessment Handbook
This handbook is applicable to those undertaking signalling safety risk assessment where Network Rail is the Infrastructure Manager. They could be either Network Rail employees or appointed...
August 26, 2008
Prevention and Mitigation of Overruns
This Level 2 document applies to anyone given the responsibility by Network Rail for conducting overrun risk assessments of railway signals forming part of track layouts and fixed block signalling...
RT/E/P/14201 ISSUE 1
April 1, 2003
Prevention and Mitigation of Overruns - Risk Assessment of Signals (aka NR/SP/SIG/14201)
This procedure applies to anyone given the responsibility by Network Rail for conducting overrun risk assessments of railway signals forming part of track layouts and fixed block signalling systems...

References

Advertisement