NR - RT/E/P/14201 ISSUE 1
Prevention and Mitigation of Overruns - Risk Assessment of Signals (aka NR/SP/SIG/14201)
| Organization: | NR |
| Publication Date: | 1 April 2003 |
| Status: | inactive |
| Page Count: | 25 |
scope:
This procedure applies to anyone given the responsibility by
Network Rail for conducting overrun risk assessments of railway
signals forming part of track layouts and fixed block signalling
systems on Network Rail Controlled Infrastructure. They may be
either Network Rail employees or appointed contractors/consulta
It will be used for the assessment of safety risk: -
• uring the design of new/altered layouts and fixed block signalling systems on Network Rail Controlled Infrastructure.
• rising as a result of the operation of layouts and signalling.
Purpose
This document sets out the process and tools that Network Rail shall use to comply with the Railway Group Standard GI/RT7006, Prevention and Mitigation of Overruns - Risk Assessment, and its associated Guidance Note GI/GN7606. Specifically this Procedure mandates: -
• he structured approach to signal overrun, i.e. "Signal Passed at Danger" (SPAD) risk assessment on Network Rail Controlled Infrastructure.
• The appropriate strategies, tools, and techniques to be applied under the variety of operational and developmental situations that lead to a requirement for a signal overrun risk assessment to be undertaken.
• A clear approach to SPAD risk assessment, which shall be standardised throughout Network Rail.
Document History