UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NR/L2/SIG/14201

Signalling Risk Assessment Handbook

active, Most Current
Buy Now
Organization: NR
Publication Date: 5 December 2020
Status: active
Page Count: 9
scope:

This handbook is applicable to those undertaking signalling safety risk assessment where Network Rail is the Infrastructure Manager. They could be either Network Rail

employees or appointed contractors/consultants acting on behalf of Network Rail.

This handbook applies for the assessment of signalling safety risk:

a) during the development and implementation of change to Network Rail controlled infrastructure;

b) arising as a result of the operation of trains on Network Rail controlled infrastructure.

The risk assessment of overrun, detailed in this document, only applies to lineside signalling. ETCS will be covered by a separate ETCS overrun risk assessment.

The manual does not include level crossing suitable and sufficient risk assessment which is subject to operations standards.

Risk assessments in support of deviations should be addressed in in the noncompliance application and certification process.

Purpose

This manual provides a framework for consistent production of suitable and sufficient risk assessments for the Signalling system.

It sets out the procedures and the specification of tools that Network Rail uses to comply with published standards requiring signalling risk assessment.

Document History

NR/L2/SIG/14201
December 5, 2020
Signalling Risk Assessment Handbook
This handbook is applicable to those undertaking signalling safety risk assessment where Network Rail is the Infrastructure Manager. They could be either Network Rail employees or appointed...
March 2, 2019
Signalling Risk Assessment Handbook
This handbook is applicable to those undertaking signalling safety risk assessment where Network Rail is the Infrastructure Manager. They could be either Network Rail employees or appointed...
September 1, 2018
Signalling Risk Assessment Handbook
This handbook is applicable to those undertaking signalling safety risk assessment where Network Rail is the Infrastructure Manager. They could be either Network Rail employees or appointed...
August 26, 2008
Prevention and Mitigation of Overruns
This Level 2 document applies to anyone given the responsibility by Network Rail for conducting overrun risk assessments of railway signals forming part of track layouts and fixed block signalling...
April 1, 2003
Prevention and Mitigation of Overruns - Risk Assessment of Signals (aka NR/SP/SIG/14201)
This procedure applies to anyone given the responsibility by Network Rail for conducting overrun risk assessments of railway signals forming part of track layouts and fixed block signalling systems...

References

Advertisement