UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

IEEE - 400.3

Guide for Partial Discharge Field Diagnostic Testing of Shielded Power Cable Systems

active, Most Current
Organization: IEEE
Publication Date: 3 December 2022
Status: active
Page Count: 63
scope:

This guide covers the diagnostic testing of new or service-aged, installed shielded power cable systems, which include cable, joints, and terminations, using electrical partial discharge (PD) detection, measurement, and location. PD testing, which is a useful indicator of insulation degradation, may be carried out online or by means of an external voltage source. This guide does not cover the testing of compressed gas insulated cable or termination systems.

Purpose

This guide describes diagnostic methods capable of detecting and locating PD from defects and damage in installed shielded power cable systems. The results of PD tests can be used to assess the condition of cables and accessories.

Document History

400.3
December 3, 2022
Guide for Partial Discharge Field Diagnostic Testing of Shielded Power Cable Systems
This guide covers the diagnostic testing of new or service-aged, installed shielded power cable systems, which include cable, joints, and terminations, using electrical partial discharge (PD)...
September 15, 2006
IEEE Guide for Partial Discharge Testing of Shielded Power Cable Systems in a Field Environment
This guide covers the diagnostic testing of new or service-aged installed shielded power cable systems, which include cable, joints, and terminations, using PD detection, measurement, and location....

References

Advertisement