NR/L3/TRK/002/A06
S&C - Detailed Inspection of Switches
active, Most Current
Buy Now
| Organization: | NR |
| Publication Date: | 1 March 2008 |
| Status: | active |
| Page Count: | 8 |
scope:
Includes: Switches identified as requiring inspection in accordance with NR/L2/TRK/053
Excludes: Catch points, unless used in a facing direction, half-sets of trap points which are in the open position for ordinary running, switch diamonds, visual inspection of switches during supervisors visual track inspections.
Document History
NR/L3/TRK/002/A06
March 1, 2008
S&C - Detailed Inspection of Switches
Includes: Switches identified as requiring inspection in accordance with NR/L2/TRK/053
Excludes: Catch points, unless used in a facing direction, half-sets of trap points which are in the open...