scope:
This procedure applies to the planning and documenting of the safe system of work arrangements on or near the running line as required by NR/SP/OHS/019 - Safety of people working on or near the line.
It does not repeat the requirements of NR/SP/OHS/019 but defines how compliance will be delivered.
It does not define the processes for arranging track access through T3 possessions, T2 or T12 blockages of the running line through the Possession Planning System (PPS) - that is defined within cross-functional procedure NR/SP/MTC/0056 "Work and possession planning for the railway infrastructure (meetings management pack)" and NR/SP/MTC/0086 "Work and possession planning for the railway infrastructure: Change
Purpose
To define the process for:
• pre-planning of safe system of work arrangement for use at site or
• the provision of either the part completed "COSS Pack" documents to the Controller of Site Safety (COSS) or Individual Working Alone (IWA) or
• for exceptional circumstances; provision of information so that the documents can easily be completed at site by the COSS or IWA as required by NR/SP/OHS/019.
Document History