Planning & Documenting the Safe System of Work Arrangements (aka NR/PRC/MTC/TK0009)

inactive
Organization: NR
Publication Date: 26 August 2008
Status: inactive
Page Count: 12
scope:

This procedure applies to the planning and documenting of the safe system of work arrangements for working on or near the running line, as required by NR/L2/OHS/019 "Safety of people working on or near the line". It does not repeat the requirements of NR/L2/OHS/019 but defines how compliance will be delivered.

It does not define the processes for arranging track access through T3 possessions, T2 or T12 blockages of the running line through the Possession Planning System (PPS) - that is defined within cross-functional procedure NR/L2/MTC/PL0056 "Work and possession planning for the railway infrastructure (meetings management pack)" and NR/L2/MTC/PL0086 "Work and possession planning for the railway infrastructure: change control".

Purpose

To define the process for:

• pre-planning of safe system of work arrangement for use at site; or

• the provision of either the part completed "COSS pack" documents to the Controller of Site Safety (COSS) or

• Individual Working Alone (IWA); or in exceptional circumstances; provision of information so that the documents can easily be completed at site by the COSS or IWA as required by NR/L2/OHS/019.

Document History

June 6, 2009
Planning & Documenting the Safe System of Work Arrangements (aka NR/PRC/MTC/TK0009)
This procedure applies to the planning and documenting of the safe system of work arrangements for working on or near the running line, as required by NR/L2/OHS/019 "Safety of people working on or...
March 7, 2009
Planning & Documenting the Safe System of Work Arrangements (aka NR/PRC/MTC/TK0009)
This procedure applies to the planning and documenting of the safe system of work arrangements for working on or near the running line, as required by NR/L2/OHS/019 "Safety of people working on or...
NR/L3/MTC/PL0094 ISSUE 2
August 26, 2008
Planning & Documenting the Safe System of Work Arrangements (aka NR/PRC/MTC/TK0009)
This procedure applies to the planning and documenting of the safe system of work arrangements for working on or near the running line, as required by NR/L2/OHS/019 "Safety of people working on or...
February 1, 2007
Planning & Documenting the Safe System of Work Arrangements
This procedure applies to the planning and documenting of the safe system of work arrangements on or near the running line as required by NR/SP/OHS/019 – Safety of people working on or near the line....