NR/L2/OPS/084 ISSUE 3
Permissive Platform Working (aka NR/SP/OPS/084)
| Organization: | NR |
| Publication Date: | 6 March 2010 |
| Status: | inactive |
| Page Count: | 11 |
scope:
This procedure covers all permissive platform signalled moves including those defined as follows:
• for contingency arrangements
• attaching and detaching to/from passenger trains (including where one portion is ECS)
• platform sharing
This procedure does not cover the following:
• permissive non passenger train movements
• attaching/detaching to/from ECS trains (shunting with the authority of a ground position signal)
• terminal stations
• locomotives either changing ends or being changed
Purpose
To define the requirements to control the risk of train collisions when signalled in accordance with the permissive working arrangements.
Document History