NR/WI/TEL/30104

Testing Requirements - Signal Box Concentrator

active, Most Current
Buy Now
Organization: NR
Publication Date: 1 April 2006
Status: active
Page Count: 12
scope:

This Work Instruction applies as detailed in section 6.4 and 6.5 of NR/SP/TEL/30098 and is a support document for the development and production of a project Test Plan and associated Test Specification(s). It details the minimum mandatory tests that are to be carried out on concentrator installations prior to the commissioning and bringing into service of the equipment on the operational railway.

This Work Instruction does not include:

a) Any required FAT tests

b) Health and safety requirements

c) Methods for performing tests

d) The requirements for the production of a test plan

e) Installation requirements

The requirements for telecommunications installation are detailed in NR/CS/TEL/30029 Telecoms Installation and supported in NR/SP/TEL/30094 - Installation of Telecommunications Equipment and Systems.

Purpose

This Work Instruction in support of NR/SP/TEL/30098 - Testing and Commissioning of Telecommunications Equipment and Systems details the tests that are required to be carried out on a telephone concentrator installation that falls under the scope of NR/CS/TEL/30092, Telecommunication Testing and Commissioning Procedure.

Document History

NR/WI/TEL/30104
April 1, 2006
Testing Requirements - Signal Box Concentrator
This Work Instruction applies as detailed in section 6.4 and 6.5 of NR/SP/TEL/30098 and is a support document for the development and production of a project Test Plan and associated Test...

References