UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NR/SP/TEL/30133 ISSUE 1

Asset Condition Assessment for Telecommunications Equipment

inactive
Organization: NR
Publication Date: 1 April 2007
Status: inactive
Page Count: 57
scope:

All telecommunications systems, and equipment, that are owned by Network Rail.

S&T cable routes are to be inspected as denoted in NR/WI/TEL/30069 Inspection and Minor Maintenance of Lineside S&T cable routes.

Any on site condition assessments are to be visual and not intervensive in nature. Access to equipment should be limited to the opening of cabinet doors or covers which are designed to be removed easily.

Purpose

This specification sets out the methodology by which telecommunication assets are to be assessed to gauge their condition. This provides visibility by which Network Rail can understand:

• whether the telecoms infrastructure and the use to which it is being put is in accordance with the conditions of its approval and design.

• how the asset condition is performing with regard to its age and environmental conditions.

• how to plan the timely and most cost effective renewal of the asset.

• whether the maintenance regimes are robust enough to deliver the anticipated life expectancy.

Asset condition assessments are not to be confused with asset surveillance checks as detailed in NR/SP/TEL/30033 which are carried out by the maintainer to ensure that all telecom assets are being maintained in accordance with the appropriate maintenance standards.

Document History

June 2, 2018
Asset Condition Assessments for Telecoms Renewals & Enhancement Planning
This work instruction applies to telecommunications systems and equipment that Network Rail has a renewal responsibility for. It applies to Network Rail Telecoms Asset Management teams when...
NR/SP/TEL/30133 ISSUE 1
April 1, 2007
Asset Condition Assessment for Telecommunications Equipment
All telecommunications systems, and equipment, that are owned by Network Rail. S&T cable routes are to be inspected as denoted in NR/WI/TEL/30069 Inspection and Minor Maintenance of Lineside S&T...

References

Advertisement