This specification applies to all inspection and maintenance of the permanent way. It sets out:
- Minimum frequencies for routine visual, ultrasonic and geometry recording inspections;
- procedures for carrying out the above inspections;
- details of those track defects which, if found, require immediate blocking of the line to traffic or imposition of an emergency speed restriction;
- methods for detailed inspection of certain major track components.
- maintenance of the permanent way including lineside items.
Purpose
This is a system specification that gives the minimum requirements for the inspection and maintenance of Network Rail's permanent way.
Document History
June 3, 2023
Inspection and Maintenance of Permanent Way
The requirements of the modules in this standard apply to the inspection and maintenance of the following assets on running lines and sidings:
a) plain line track;
b) switches and crossings...
March 5, 2022
Inspection and Maintenance of Permanent Way
Additional information: An updated June 2023 version of NR/L2/TRK/001/mod14 Issue 8 has been published as a preview and can be used prior to formal publication.
The requirements of the modules in...
December 4, 2021
Inspection and Maintenance of Permanent Way
The requirements of the modules in this standard apply to the inspection and maintenance of the following assets on running lines and sidings:
a) plain line track;
b) switches and crossings...
September 4, 2021
Inspection and Maintenance of Permanent Way
The requirements of the modules in this standard apply to the inspection and maintenance of the following assets on running lines and sidings:
a) plain line track;
b) switches and crossings (S&C)....
June 5, 2021
Inspection and Maintenance of Permanent Way
The requirements of the modules in this standard apply to the inspection and maintenance of the following assets on running lines and sidings:
a) plain line track;
b) switches and crossings (S&C)....
June 5, 2021
Inspection and Maintenance of Permanent Way
The requirements of the modules in this standard apply to the inspection and maintenance of the following assets on running lines and sidings:
a) plain line track;
b) switches and crossings (S&C)....
March 6, 2021
Inspection and Maintenance of Permanent Way
The requirements of the modules in this standard apply to the inspection and maintenance of the following assets on running lines and sidings:
a) plain line track;
b) switches and crossings (S&C)....
December 5, 2020
Inspection and Maintenance of Permanent Way
The requirements of the modules in this standard apply to the inspection and maintenance of the following assets on running lines and sidings:
a) plain line track;
b) switches and crossings (S&C)....
March 7, 2020
Inspection and Maintenance of Permanent Way
The requirements of the modules in this standard apply to the inspection and maintenance of the following assets on running lines and sidings:
a) plain line track;
b) switches and crossings (S&C)....
December 7, 2019
Inspection and Maintenance of Permanent Way
The requirements of the modules in this standard apply to the inspection and maintenance of the following assets on running lines and sidings:
a) plain line track;
b) switches and crossings (S&C)....
September 7, 2019
Inspection and Maintenance of Permanent Way
The requirements of the modules in this standard apply to the inspection and maintenance of the following assets on running lines and sidings: a) plain line track; b) switches and crossings (S&C)....
September 1, 2018
Inspection and Maintenance of Permanent Way
The requirements of the modules in this standard apply to the inspection and maintenance of the following assets on running lines and sidings:
a) plain line track;
b) switches and crossings (S&C)....
June 3, 2017
Inspection and Maintenance of Permanent Way
The requirements of the modules in this standard apply to the inspection and maintenance of the following assets on running lines and sidings:
a) plain line track;
b) switches and crossings (S&C)....
September 3, 2016
Inspection and Maintenance of Permanent Way
The requirements of the modules in this standard apply to the inspection and maintenance of the following assets on running lines and sidings:
a) plain line track;
b) switches and crossings (S&C)....
September 5, 2015
Inspection and Maintenance of Permanent Way
The requirements of the modules in this standard apply to the inspection and maintenance of the following assets on running lines and sidings:
a) plain line track;
b) switches and crossings (S&C)....
September 5, 2015
Inspection and Maintenance of Permanent Way
The requirements of the modules in this standard apply to the inspection and maintenance of the following assets on running lines and sidings:
a) plain line track;
b) switches and crossings (S&C)....
September 6, 2014
Inspection and Maintenance of Permanent Way
The requirements of the modules in this standard apply to the inspection and maintenance of the following assets on running lines and sidings:
a) plain line track;
b) switches and crossings (S&C)....
December 1, 2012
Inspection and Maintenance of Permanent Way
The requirements of the modules in this standard apply to the inspection and maintenance of the following assets on running lines and sidings:
a) plain line track;
b) switches and crossings (S&C)....
June 2, 2012
Inspection & Maintenance of Permanent Way
The requirements of the modules in this standard apply to the inspection and maintenance of the following assets on running lines and sidings:
Plain line track; switches and crossings (S&C)
The...
December 5, 2009
Inspection & Maintenance of Permanent Way
Purpose
NR/L2/TRK/001 is a system specification that gives the minimum requirements for the inspection and maintenance of Network Rail's permanent way.
NR/L2/TRK/001 has been divided into five...
August 26, 2008
Inspection & Maintenance of Permanent Way
This specification applies to all inspection and maintenance of the permanent way. It sets out:
Minimum frequencies for routine visual, ultrasonic and geometry recording inspections;
procedures for...
NR/SP/TRK/001 ISSUE 2
October 1, 2005
Inspection & Maintenance of Permanent Way
This specification applies to all inspection and maintenance of the permanent way. It sets out:
Minimum frequencies for routine visual, ultrasonic and geometry recording inspections;
procedures for...
August 1, 2005
Inspection & Maintenance of Permanent Way
This specification applies to all inspection and maintenance of the permanent way. It sets out:
• mandatory frequencies for routine visual, ultrasonic and geometry recording inspections;
•...