UNLIMITED FREE
ACCESS
TO THE WORLD'S BEST IDEAS

SUBMIT
Already a GlobalSpec user? Log in.

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

Customize Your GlobalSpec Experience

Finish!
Privacy Policy

This is embarrasing...

An error occurred while processing the form. Please try again in a few minutes.

NR/WI/ELP/27135 ISSUE 2

Recording method for d.c. safe setting calculations

inactive
Organization: NR
Publication Date: 1 April 2006
Status: inactive
Page Count: 7
scope:

Introduction

The Area Electrification and Plant (E&P) Engineer shall be responsible for maintaining the up to date records of all previously calculated d.c. section "safe" settings and carrying out all future d.c. section "safe" setting calculations.

Master copies of d.c. track section data held on computer disk will be updated regularly by the appropriate Area E&P Engineer or representative and sent to the Territory Engineer E&P at six monthly intervals.

The Area E&P Engineer shall be responsible for holding the master library of data for the d.c. track sections.

Document History

June 1, 2008
Recording Method for DC Safe Setting Calculations
Introduction The Maintenance Engineer (E&P) or representative shall be responsible for maintaining the up to date records of all previously calculated d.c. section "safe" settings and carrying out...
NR/WI/ELP/27135 ISSUE 2
April 1, 2006
Recording method for d.c. safe setting calculations
Introduction The Area Electrification and Plant (E&P) Engineer shall be responsible for maintaining the up to date records of all previously calculated d.c. section "safe" settings and carrying out...
December 4, 2004
DC Safe Setting Calculation Recording Procedures (aka NR/WI/ELP/27135)
Introduction The third rail d.c. traction system is supplied from 660/750V traction rectifiers via d.c. track breakers. The main purpose of the track breaker is to protect and isolate the system...
Advertisement