NR/WI/TEL/31104 ISSUE 1

Process for Managing Telecoms Software/Hardware Changes

inactive
Organization: NR
Publication Date: 3 February 2007
Status: inactive
Page Count: 15
scope:

This Work Instruction addresses the requirements of and applies a change control process to all hardware and software changes for telecoms equipment for which there is an existing product acceptance certificate signed by the Head of Telecoms Engineering.

This Work Instruction applies to Network Rail telecoms engineering staff. Manufacturers may use this procedure or may use their own alternative procedure as long as it has been approved as suitable by the NST portfolio owner and listed as such in the certificate.

This Work Instruction excludes "like for like" hardware changes which are made to correct faults. These are covered by maintenance procedures.

This Work Instruction excludes user changes allowed as selection options by the manufacturer or user unless the selection of the option is specifically prohibited in the product acceptance certificate.

This Work Instruction excludes commercial and financial considerations associated with a change but accepts that it may be necessary to upgrade systems to a specific software level in order to maintain 3rd line support contract arrangements.

Purpose

This Work Instruction addresses the requirements of product pcceptance when changing hardware or software on systems that have previously gained acceptance.

The Work Instruction mandates a process to ensure that all software and hardware changes to operational telecoms equipment, for which there is an existing product acceptance certificate signed by the Head of Telecoms Engineering, are carried out in a structured and controlled manner, and are planned so as to minimise the risks of disruption to equipment, systems and train service plans.

Document History

March 6, 2021
Process for Managing Telecoms Software/Hardware Changes
This standard is mandatory for existing operational telecommunications equipment and services and is recommended as best practice for non-operational equipment. This standard specifies the hardware...
March 6, 2010
Process for Managing Telecoms Software/Hardware Changes
This Standard addresses the requirements of and applies a change control process to all hardware and software changes for telecoms equipment for which there is an existing signed product acceptance...
August 26, 2008
Process for Managing Telecoms Software/Hardware Changes
This Work Instruction addresses the requirements of and applies a change control process to all hardware and software changes for telecoms equipment for which there is an existing product acceptance...
NR/WI/TEL/31104 ISSUE 1
February 3, 2007
Process for Managing Telecoms Software/Hardware Changes
This Work Instruction addresses the requirements of and applies a change control process to all hardware and software changes for telecoms equipment for which there is an existing product acceptance...

References

Advertisement